Menu and volume
List the meals, busiest service period, preparation tasks and staff who will use the temporary kitchen. Request the layout and equipment list for the unit offered.

Plan a temporary commercial kitchen in Industry, California around your menu, meal volume, site access and dates. The local example below shows one situation to discuss with FFM; the actual trailer, delivery route and price are confirmed for your project.
01 / Los Angeles County · San Gabriel Valley
Hypothetical rental example. This is not an FFM customer or completed deployment.
A contractor on a future warehouse phase in the City of Industry could request a temporary workforce kitchen plan for crews arriving from Walnut and La Puente. The property owner would first approve the equipment area and confirm the construction delivery schedule. Share the intended menu, meal shifts, site access, dimensions and utility plan so a kitchen trailer and any cold-storage request can be quoted separately.
Shea Properties announced on October 6, 2026 that construction had begun on Shea Center Industry, a two-building warehouse and distribution project totaling about 118,232 square feet in the City of Industry. The announcement describes the developer's project; it does not identify an FFM customer, tenant or rental. Confirm current construction phases and site access with the project owner.
02 / Equipment plan
For a separate crew-food plan, confirm the general contractor's approved staging area, gate contact, truck arrival window and worker route. Estimate meals by trade and shift; then review trailer dimensions, turning room, clearances, power, potable water and wastewater. Quote refrigeration separately if the menu needs it. Any delivery route, equipment configuration and availability must be verified for the actual site.
For a contractor considering crew food service near City of Industry, first obtain the general contractor's site logistics plan and approved staging address. Share the construction phase, number of trades, meal breaks, menu, worker entrance, truck dimensions and delivery schedule. Check the pad, loading gate, turning path, overhead constraints, electrical service, potable water, wastewater and fire access before choosing a mobile kitchen trailer. Shea Center Industry's construction notice is project context only; it does not show that the project requested or received FFM equipment.
Compare mobile commercial kitchen trailer layouts ↗List the meals, busiest service period, preparation tasks and staff who will use the temporary kitchen. Request the layout and equipment list for the unit offered.
Share the exact address, a site plan and photos of the approach. Confirm trailer turning space, level placement, staff access and the route between the kitchen and serving area.
Review power, potable water, wastewater, grease handling, ventilation clearance and any approvals before the permanent kitchen goes offline.
03 / Site checklist
Identify a safe equipment position and the utilities actually available at your address. Give the team the length and width of the proposed pad, any gate or overhead restrictions, and the distance to the serving point.
Ask California and local food-service reviewers which permits and inspections apply. Delivery, connections and equipment availability are quoted for your exact site and dates.
04 / Published starting rates
These published starting prices help frame a Industry project. Your written quote confirms the available trailer, rental period, delivery route and site work.
Starting price per rental. The rental period, minimum term, delivery and pickup charges are confirmed in your written quote. Call 866-216-4676.
05 / Supporting equipment
Refrigeration can be quoted as a separate support unit after you identify inventory, volume, temperature needs and the power available at the staging area. Confirm stocking access and delivery timing with the site lead. Ask separately about dishwashing needs if the temporary operation has no usable wash area.
Review the refrigeration trailer and cold-storage options for the stock in this plan. Confirm chilled or frozen operation, storage volume, electrical supply, loading access and the temperature controls of the actual unit quoted. Ask for a written starting-price quote for the required configuration; the rental period and all delivery or pickup charges are confirmed there.
If the existing wash area also closes, ask about a commercial dishwashing trailer. Share the busiest tray and pan return period, the sanitation method, hot-water source and wastewater plan. Request its starting price and rental terms in writing.
Start with the cooking space your operation needs. Add washing, cold storage or crew facilities where the existing site cannot support the work.

Plan temporary cooking, preparation and service space during a renovation, construction project or kitchen closure. Match the proposed layout to your menu, busiest meal period, delivery access, power, water and wastewater.
Explore kitchen trailers
KITCHEN SUPPORTDishwashing trailersKeep dish handling in the site plan. Review wash volume, clean and dirty routes, water and drainage.Explore dishwashing
KITCHEN SUPPORTRefrigeration rentalsDiscuss cooler, freezer, trailer or container needs by temperature, stock volume, loading and power.Explore refrigeration Choose the topics relevant to your site; confirm the available unit and connections in your quote.
LOCAL SCENARIOS · INDUSTRY
These Industry examples are hypothetical rental scenarios, not FFM customer jobs. The workbook supplies local context and source links; confirm current dates, site rules and details before planning.
This Industry rental scenario is hypothetical and does not describe a confirmed FFM customer or deployment.
In October 2026, Shea Properties started building Shea Center Industry, a 118,232 sq ft Class A industrial project with two buildings in the City of Industry, slated for completion in late 2027. For example, a contractor on a warehouse build like this could feed crews from a modular kitchen trailer set up as a temporary workforce kitchen, with a refrigerated trailer for food and ice and a shower combo trailer for concrete crews. The same setup works for industrial projects in Walnut and La Puente.
Oct 13, 2026: Shea Properties began construction of Shea Center Industry, 118,232 sq ft in two buildings (48,073 and 70,159 sq ft), City of Industry; completion slated for late 2027. (Context only: the scenario does not describe Shea Properties or its contractors.)
Next step
Send the address, dates, menu, peak meal count and site photos. FFM can review a suitable configuration and prepare a project-specific quote.